Where FASO is now

Evidence should clarify the position, not replace the purpose.

FASO has progressed from concept to a working Version 1 system and complete Test Rig. Governed internal system campaigns are complete, an initial controlled external-model baseline has been preserved for future comparison, and interacting-system observation and operator-facing situation awareness have been built. Independent validation and operational use have not been completed.

Current public evidence register

What exists, what it supports and what it does not authorise.

A later unpublished result must not silently turn a fixed checkpoint into a live number. Public claims remain tied to their exact evidence and date.

EvidenceStateAuthorityPublic position
FASO-EV-001Purpose, doctrine and system architectureEstablishedInternal authorityControlled public explanation
FASO-EV-002Version 1 integrated systemBuiltInternal build recordBounded build claim
FASO-EV-003Complete end-to-end Test RigBuiltInternal build and test recordBounded capability claim
FASO-EV-004Governed full-system assurance checkpointGreenInternal assurance recordBounded assurance claim
FASO-EV-005System campaigns and preserved observation baselinesCompleted internal stageGoverned internal evidenceControlled capability summary
FASO-EV-006Interacting-system observation and operator presentationBuiltInternal build and run recordBounded capability claim
FASO-EV-007Independent blind validationNot completedFuture external authorityNo validation claim
FASO-EV-008Controlled operational pilotNot startedFuture separate authorityNo operational claim

Checkpoint boundary: A complete internal assurance run was green at the published checkpoint. Internal work continued after that checkpoint. The statement is not presented as a live counter or independent validation.

Three kinds of proof

Existence, execution and validity answer different questions.

FASO’s public language must state which question the evidence actually answers.

01

Build evidence

Does the capability exist?

Architecture, implementation, integration, controlled assurance and protected backups.

02

Run evidence

What did the system do?

Governed scope, actual outcomes, timing, identity, traceable state results and retained evidence.

03

Validation evidence

Does the proposition survive independent challenge?

External method, blinded evidence, ground truth, thresholds, analysis, limitations and an independent final report.

Evidence discipline

A result must remain reviewable after the run has ended.

  1. Immutable evidence and execution identity
  2. Authority and operator
  3. Beginning and ending time
  4. Exact input and output references
  5. Configuration and controlled-evidence integrity
  6. Expected and actual outcomes
  7. Pass, fail, blocked or not-run status
  8. Evidence links and digests
  9. Plain-English explanation
  10. Limitations and uncertainty

Next evidence gate

Internal proof prepares FASO to be challenged. It does not complete the challenge.

The Test Rig and validation page explains exactly where internal testing ends and independent validation begins.