Material progress and current position
Report changes in state—not activity for its own sake.
FASO updates distinguish completed foundations, current work, future evidence gates and institutional status so that progress remains understandable without becoming overclaim.
Current position
Phase 0 has moved from definition into system proof and institutional preparation.
The update page records material changes in state. It is not a stream of every build action or an attempt to make activity look like impact.
Purpose, doctrine and system architecture
The observatory role, evidence discipline, protected boundaries and complete system proposition were defined.
Version 1 integrated system
The architecture became working software. This supports a build claim, not an independent validity claim.
Complete end-to-end Test Rig
The accepted system can be exercised end to end with reproducible evidence, controlled outcomes and reviewable state results.
Governed internal system campaigns
The internal campaign stage completed with retained evidence, separately authorised repair and controlled rerun.
Interacting-system observation and operator presentation
Time-linked evidence across interacting artificial-intelligence components can be presented for governed human review and situation awareness.
Initial external-model observation baseline
An initial controlled baseline has been preserved for future comparison. This is internal evidence, not independent validation or an operational deployment claim.
Independent validation and funding engagement
The prospectus and validation proposition support discussions with prospective reviewers, academic institutions, developers and funders.
Independent challenge and institutional formation
No operational progression is authorised until external evidence, governance and resources support it.
How updates are governed
A public update should change understanding, not merely announce motion.
Material progress, failure, correction, external findings and changes in institutional status deserve public records. Routine internal activity does not automatically belong here.
Exact current evidence
The evidence register is the authority for present public claims.
Updates explain movement. The evidence page identifies what each current claim is actually based on.